STANDARD OPERATING PROCEDURE – TAP OFF BOX PPM
OBJECTIVE:
To establish a procedure for operation and maintenance of Tap-off box.
POLICY:
The Tap-off box operation shall be carried out in safe, smooth, trouble free without affecting the occupants with reduced down time.
RESPONSIBILITY:
Shift Engineer
PROCEDURE:
· Put OFF the supply where you want to carry out the work.
· Make sure LOTO device should applied for energy source.
· Provide a board “Men at work do not switch on”.
· Ensure you are standing on an insulating rubber mat/ Electrically insulated surface required
· Make sure all PPE’s are equipped while working.
· Have proper tools like insulated plier, test lamp, tester, wire stripper, and fuse puller.
· Ensure conductor is dead before handling it.
· Inspect locking devices for signs damage or worn.
· Clean thoroughly, vacuum, and full visual inspection of exterior and interior of all LV Panel/switchboards.
· Verify control circuit fuse rating and continuity.
· Check and torque test bolted electrical connections as necessary to specified levels.
· Visual inspection for signs of overheating or deterioration take thermography if required.
· Final visual inspection to insure all clear after work completed.
· Inspection of all panels for paint work damage and signs of corrosion.
After Carry out the maintenance.
· Before charging the supply, ensure that no tools are left inside the panel.
· Close the doors of the panel.
· Leave the workplace only after satisfactory trial.
· Frequency for preventive maintenance of the low-tension panel is once in a six month.
· Ensure breaker in proper position inside the panel.
· Check incoming voltage between R-Y, Y-B and B-R on the voltmeter provided, it should be 415 to 430 or 230 to 240 volts wherever applicable.
· At any job motto should be safety first.
· In case of any major problem, inform the Facility Manager immediately.
REVISION GUIDE:
Any change in the systems will need a change in the SOP.