STANDARD OPERATING PROCEDURE – HVAC VRV OUTDOOR SYSTEM PPM ACTIVITY
OBJECTIVE:
To establish a procedure for ladder inspection.
POLICY:
Proactively identify, correct, and report ladder defects and damages to promote worker safety in compliance with regulations.
RESPONSIBILITY:
Shift Engineer
PROCEDURE:
· Before activity all PPE’s should available.
· Apply LOTO equipment to the supply source.
· Make sure System is isolated from the main supply.
· Clean coils and condensers
· Replace all of your unit’s filters
· Check the outside unit, clear any debris, and ensure the cabinet door is closed
· Check the cabinet for leaks
· To ensure proper airflow, clear any clogs in the drain lines
· Check the refrigerant charge, thermostats, and all connections associated with the electrical system
· Inspect the ducts for dust and mold, and inspect the blowers and blades
· Make sure the fan motor is operating correctly and lubricate any moving parts
· At any job motto should be safety first.
· In case of any major problem, inform the Facility Manager immediately.
REVISION GUIDE:
Any change in the systems will need a change in the SOP.