STANDARD OPERATING PROCEDURE – DAILY HVAC INSPECTION
OBJECTIVE:
These procedures serve as guidance for Authorized staff to inspect HVAC systems, for any hazard, failure, and condition of respective area.
POLICY:
The HVAC system should work as standard with zero breakdowns and should kept clean with maintaining all safety.
RESPONSIBILITY:
Shift Engineer
PROCEDURE:
· Check for all AC control panels for any troubles/Issues.
· Chiller plant changeover to be done on 8 AM as per requirements.
· Check for all chiller plant motors pumps are in normal condition.
· Check for TFA&AHU working normal and turned on as scheduled.
· Check for Is PAC working normal.
· Check if Is scrubber panel indication normal/ working.
· Check for any abnormal noise and troubles for VRV outdoor systems.
· Check for Is all Exhaust system ON and working on scheduled time.
· Make sure all the system should switch on within timeline.
· If any issues found should immediately informed to team leaders.
· At any job motto should be safety first.
· In case of any major problem, inform the Facility Manager immediately.
REVISION GUIDE:
Any change in the systems will need a change in the SOP.