STANDARD OPERATING PROCEDURE – AHU UNIT PPM ACTIVITY
OBJECTIVE:
To establish a procedure for ladder inspection.
POLICY:
Proactively identify, correct, and report ladder defects and damages to promote worker safety in compliance with regulations.
RESPONSIBILITY:
Shift Engineer
PROCEDURE:
· Before activity all PPE’s should available.
· Apply LOTO equipment to the supply source.
· Make sure System is isolated from the main supply.
· Check all the nut & bolts of supply air filter plenum are properly fixed and tight.
· Check that no gap between supply air filter frame and filter plenum, tighten up the bolts/replace the gasket if required.
· Check manually all the duct joint of the supply and exhaust duct for air leakages & arrest them by tightening up the nut & bolts/or replace the
· gasket if required.
· Check the door lock & door handle for any damage, replace or rectify it if found damaged.
· Check manually the door gasket for any air leakage if found replace the gasket.
· Check if the nut & bolts / screw of HVAC & VU cabinet are properly fixed and tight.(If found loose, tighten it up by suitable tools or replace it, if
· required).
· Check the air leakage from HVAC & VU cabinet; tighten up the nut/bolts if required.
· Check the canvas connection of terminal branch / blower suction and discharge; replace it with a new one if found damaged.
· Check the entire duct joint for Air leakage, arrest it by tightening up of nut bolts or replace the gasket if required.
· Check the temperature of inlet / outlet of chilled water for its proper working.
· Check the temperature of inlet / outlet of hot water for its proper working.
· Check all the nuts and bolts of filters unit and tighten it up, if found loose and replace with new one, if it is found missing.
· Check the air/dust leakage from filter unit and joint of if found, arrest it by tightening of nuts and bolts or replace the gaskets if required.
· Check the canvas connection of blower suction/discharge side; if found damaged, replace it with a new one.
Electrical
· Open the panel of the machine & clean it properly.
· Tighten all the electrical connections, if found loose.
· Clean the contacts of the contactor.
· Check that the relay setting of the machine motor is at the rated maximum current of the motor.
· Check the starter for proper reverse & forward direction of the motor, if not, rectify/replace it.
· Dress all the cables / conduits in the panel & replace if required.
· Switch ‘ON’ the main supply and check all sensors for its working.
Cooling Coil
· Switch ‘OFF’ the main supply.
· Open the doors of cooling coil section of the AHU.
· Clean the surfaces of and cooling coil with the dry cloth.
· Wash the inner surfaces of fins with the water.
· Clean the drain of the AHU and inner surfaces of the AHU with the cloth.
· Ensure that the water is not stagnant at the drain.
Motor
· Ensure that the main power supply of the equipment is disconnected & all utilities are isolated.
· Ensure that the machine is free of any dust on it.
· Check for the condition of the bearing & replace if required.
· Lubricate the bearings with AP-3 or its equivalent grease & assemble it on the shaft.
Blower
· Remove the pulleys from its position.
· Check the condition of the pulley / Key / Keyways & rectify / replace if required.
· Check the condition of the belts & replace if required.
· Check the condition of the bearings & replace if required.
· Lubricate the bearings with AP-3 or its equivalent grease.
· Fit the pulleys back to its position.
· Fit the ‘V’ belts on the pulleys
· Remove the ‘UNDER PREVENTIVE MAINTENANCE’.
Trial
· Switch ON the main supply to the machine.
· Check the operation of the machine & set if required.
· Check the current drawn by the motors; it should not be more than the rated current.
· At any job motto should be safety first.
· In case of any major problem, inform the Facility Manager immediately.
REVISION GUIDE:
Any change in the systems will need a change in the SOP.