STANDARD OPERATING PROCEDURE – DAILY CRITICAL ROOM CHECKLIST (UPS, BATTERY & ELECTRICAL ROOM)
OBJECTIVE:
These procedures serve as guidance for Authorized staff to inspect critical area for any hazard, failure, and condition of respective area.
POLICY:
The Electrical Equipment’s panel should work as standard with zero breakdowns and should kept clean with maintaining all safety.
RESPONSIBILITY:
Shift Engineer
PROCEDURE:
· Check for door Access, Push Button operational are in good condition.
· Check for Temperature displays functional.
· Note down Temperature and Humidity.
· Check raw power panel indicator functional or not.
· Check for UPS panel indicator functional.
· Are UPS Panel Energy meter functional?
· Check for Raw Power Panel Energy meter functional.
· Check for inverter is functional and clean.
· Check for all DB and Panel door lock properly.
· Check for Electrical Room floor is clean, and no unexpected material placed.
· Check for electrical insulation Mat is in good condition.
· Check for all Lights are clean and operational.
· Check if Cassette Unit is operational.
· Check for fall ceiling tiles are in good aligned and in good condition.
· Check for Exhaust fan is operational.
· Carryout all preventive maintenance activities as per the PPM work order and Check lists.
· At any job motto should be safety first.
· In case of any major problem, inform the Facility Manager immediately.
REVISION GUIDE:
Any change in the systems will need a change in the SOP.