STANDARD OPERATING PROCEDURE – DAILY CRITICAL ROOM CHECKLIST (UPS, BATTERY & ELECTRICAL ROOM)

 OBJECTIVE:

These procedures serve as guidance for Authorized staff to inspect critical area for any hazard, failure, and condition of respective area.

 

POLICY:

The Electrical Equipment’s panel should work as standard with zero breakdowns and should kept clean with maintaining all safety.

 

RESPONSIBILITY:

 

Shift Engineer

 

 

PROCEDURE:

 

·        Check for door Access, Push Button operational are in good condition.

·        Check for Temperature displays functional.

·        Note down Temperature and Humidity.

·        Check raw power panel indicator functional or not.

·        Check for UPS panel indicator functional.

·         Are UPS Panel Energy meter functional?

·        Check for Raw Power Panel Energy meter functional.

·        Check for inverter is functional and clean.

·        Check for all DB and Panel door lock properly.

·        Check for Electrical Room floor is clean, and no unexpected material placed.

·        Check for electrical insulation Mat is in good condition.

·        Check for all Lights are clean and operational.

·         Check if Cassette Unit is operational.

·        Check for fall ceiling tiles are in good aligned and in good condition.

·        Check for Exhaust fan is operational.

·        Carryout all preventive maintenance activities as per the PPM work order and Check lists.

·        At any job motto should be safety first.

·        In case of any major problem, inform the Facility Manager immediately.

 

 

REVISION GUIDE:

Any change in the systems will need a change in the SOP.

 

Comments

Popular posts from this blog

STANDARD OPERATING PROCEDURE – DB/LT PANEL PPM

STANDARD OPERATING PROCEDURE – LUX LEVEL MEASUREMENT

STANDARD OPERATING PROCEDURE – SCRUBBER UNIT PPM ACTIVITY