STANDARD OPERATING PROCEDURE - CARPENTRY WORK

 Objective- 

To establish a procedure for Carpentry Work.

 

POLICY:

Proactively identify, correct, and report defects and damages to reduce down time and risk of failure of the equipment’s and assets.

 

RESPONSIBILITY:

 

Shift Engineer

 

 

GENERAL SAFETY TIPS

•       Safety glasses with side shields must be worn at all times.

•       Do not wear loose clothing, loose neckwear or exposed jewelry while operating machinery.

•       Do not work alone in a machine shop.

•       Long sleeves on shirts should be rolled up above the elbows.

•       Pull back and secure long hair.

•       Required to wear Safety shoes all time.

•       Always keep hands and other body parts a safe distance away from moving machine parts, work pieces, and cutters.

•       Use hand tools for their designed purposes only.

•       Report defective machinery, equipment, or hand tools to the Technician.

 

Painting work:

 

•       Before start of painting, check if there is any crack/hole on wall.

•       Prepare fresh putty paste and apply same in crack/hole.

•       Allow putty to dry.

•       After drying, rub the surface to make the surface smooth and plain.

•       Apply primer and the paint as per requirement.

 

Flooring work:

•       Check damages/cracks on the floor and coving.

•       In case of epoxy flooring, open the crack and remove the epoxy layer from

floor/coving.

•       Prepare the surface where the epoxy layer is to be applied.

•       Prepare fresh epoxy mortar and lay the same on the floor/coving.

•       Allow to soak for 24 hours.

•       In case of tile or stone flooring, remove the tiles or stones and replace the

same with new tiles/stones.

Door and window repairing:

•       Check the door accessories for any loosening and for any other breakage.

Rectify if found faulty.

•       Check the door closures and adjust the speed if required.

•       Check handles and identify any loose fitting.

•       Check sealing of glass for intactness. Fill with sealant if gaps are

observed.

•       Check the glass of doors/windows for intactness. Replace if any cracks

found.

 

 

REVISION GUIDE:

Any change in the systems will need a change in the SOP.             